Skip to content
Snippets Groups Projects

Bjansik

Merged Branislav Jansik requested to merge bjansik into master
@@ -6,16 +6,16 @@ The wall-clock core-hours (WCH) are the basic metric of computer utilization tim
1 wall-clock core-hour is defined as 1 processor core allocated for 1 hour of wall-clock time. Allocating a full node (16 cores Anselm, 24 cores Salomon)
for 1 hour amounts to 16 wall-clock core-hours (Anselm) or 24 wall-clock core-hours (Salomon).
### Standard Core-Hours SCH
### Normalized Core-Hours NCH
The resources subject to accounting are the standard core-hours (SCH).
The standard core-hours are obtained from WCH by applying a standardization factor:
The resources subject to accounting are the normalized core-hours (NCH).
The normalized core-hours are obtained from WCH by applying a normalization factor:
$$
SCH = F*WCH
NCH = F*WCH
$$
All jobs are accounted in standard core-hours, using factor F valid at the time of the execution:
All jobs are accounted in normalized core-hours, using factor F valid at the time of the execution:
| System | F | Validity |
| ------------------------------- | - | -------- |
@@ -28,11 +28,12 @@ the cores are actually used for any calculation.
!!! note
*The allocations are requested/granted in standard core-hours SCH.
*Whenever the term core-hour is used in this documentation, we mean the standard core-hour, SCH.
*The allocations are requested/granted in normalized core-hours SCH.
Whenever the term core-hour is used in this documentation, we mean the normalized core-hour, NCH.
The standard core-hours were introduced to treat systems of different age on equal footing.
Standard core-hour is an accounting tool to discount the legacy systems. The past (before 2017-09-11) F factors are all 1.0.
The normalized core-hours were introduced to treat systems of different age on equal footing.
Normalized core-hour is an accounting tool to discount the legacy systems. The past (before 2017-09-11) F factors are all 1.0.
In future, the factors F will be updated, as new systems are installed. Factors F are expected to only decrease in time.
See examples in the [Job submission and execution](job-submission-and-execution/) section.
@@ -46,14 +47,14 @@ $ it4ifree
Projects I am participating in
==============================
PID Days left Total Used WCHs Used SCHs WCHs by me SCHs by me Free
PID Days left Total Used WCHs Used NCHs WCHs by me NCHs by me Free
---------- ----------- ------- ----------- ----------- ------------ ------------ -------
OPEN-XX-XX 323 0 5169947 5169947 50001 50001 1292555
Projects I am Primarily Investigating
=====================================
PID Login Used WCHs Used SCHs
PID Login Used WCHs Used NCHs
---------- ---------- ----------- -----------
OPEN-XX-XX user1 376670 376670
user2 4793277 4793277
@@ -61,6 +62,6 @@ OPEN-XX-XX user1 376670 376670
Legend
======
WCH = Wall-clock Core Hour
SCH = Standard Core Hour
NCH = Normalized Core Hour
```
The **it4ifree** command is a part of it4i.portal.clients package, located here: <https://pypi.python.org/pypi/it4i.portal.clients>
\ No newline at end of file
Loading