6 merge requests!368Update prace.md to document the change from qprace to qprod as the default...,!367Update prace.md to document the change from qprace to qprod as the default...,!366Update prace.md to document the change from qprace to qprod as the default...,!323extended-acls-storage-section,!196Master,!159Bjansik
@@ -6,16 +6,16 @@ The wall-clock core-hours (WCH) are the basic metric of computer utilization tim
1 wall-clock core-hour is defined as 1 processor core allocated for 1 hour of wall-clock time. Allocating a full node (16 cores Anselm, 24 cores Salomon)
for 1 hour amounts to 16 wall-clock core-hours (Anselm) or 24 wall-clock core-hours (Salomon).
### Standard Core-Hours SCH
### Normalized Core-Hours NCH
The resources subject to accounting are the standard core-hours (SCH).
The standard core-hours are obtained from WCH by applying a standardization factor:
The resources subject to accounting are the normalized core-hours (NCH).
The normalized core-hours are obtained from WCH by applying a normalization factor:
$$
SCH = F*WCH
NCH = F*WCH
$$
All jobs are accounted in standard core-hours, using factor F valid at the time of the execution:
All jobs are accounted in normalized core-hours, using factor F valid at the time of the execution: